Why buildings are important (Dr. Bettridge)
April 18, 1999
Following the positive vote in the congressional meeting held on April 18, the session is working to further define the plans for expansion of our facilities. The studies are under the direction of the Joint Administration Committee.
Their next step is it to work with John Messina AIA to develop a request for proposal (RFP) to go to several architectural firms. They are to develop detail plans and estimates of the costs for the new building(s). They expect to have the RFP out in July and proposals in from the architectural firms by October.
July 15th, 1999
The expansion plans are moving forward. Because of some of the Pima County drainage changes we are having ELM look at the drainage on the Annex property. We will probably not get the RFP for the next phase started until early August. Stay tuned for a schedule.
August 22, 1999
The JAC is still considering options for the placement of the new sanctuary. They have requested 3 new options from the architect and are waiting for the response. The committee expects to review these at the next meeting on August 24th.
September 14, 1999
The congregational vote last April directed the Joint Administrative Committee to develop plans for a new sanctuary. At the time, the Joint Administrative Committee was considering a variety of options. Several options were based upon the acquisition of the residence located east of the church on Chapala Drive. Other options were based upon the construction of a new sanctuary in the main parking area to the north of the church on Paseo del Norte. We have been unable to obtain the necessary consent of our neighbors to develop these options adjacent to the current main campus.
The remaining option is construction of the new sanctuary on the site where the annex is now located. These properties are zoned for church use only and neighbor consent is not required for construction at that location. In order to facilitate the development of a sanctuary on that site, the Joint Administrative Committee has investigated the possibility of acquiring adjacent land to the west of the annex on Chapala Drive which is now owned by Northwest Bible Church. If the Northwest Bible Church property can be acquired, the additional land will be available for parking. The modular buildings presently located on the Northwest Bible Church property will be removed. The existing building will be converted to uses consistent with the planned construction of a new sanctuary.
The discussions with Northwest Bible Church are very preliminary. A final decision to purchase agreement will be presented to the congregation of St. Andrews.
December 20, 1999
The Joint Administrative Committee has concentrated its efforts on developing adequate plans for the implementation of a new Sanctuary for St. Andrews.
The existing Sanctuary is beautiful; it has served our church well for almost forty years; it has been expanded twice. It does not have an adequate seating capacity for our growing congregation (approximately 3% per year). It cant be expanded again because of the proximity of other buildings. In addition to a limiting seating capacity (we have grown to a point where we are losing potential members) it has poor acoustics and visibility obstructions.
We selected the architectural firm of Erickson, Leader, & Martinez (ELM) to determine the feasibility of adding a sanctuary with a seating capacity of 1,000 on the existing properties. The results of this study were reviewed with the congregation at a series of meetings in March and April. After these informational meetings the Session called a congregation meeting to discuss our work and to determine if we should continue to develop plans for a facility expansion. The congregation overwhelmingly (93% in favor) authorized us to continue.
Based on data from the Long Range Planning Committee, discussions with working groups within the church and the results of the ELM feasibility study we have moved forward to locate the site for a new sanctuary. Existing building codes, covenants, and space limitations preclude building a structure of any substantial size on the main campus. Pima County zoning, parking and hydrology regulations have frustrated our efforts to locate a sanctuary on the Annex property to the point that we have met with county officials to understand their position.
We have had and continue to have discussions with the Northwest Bible Church, located directly to the West of the Annex on Chapala Drive. We believe that it is possible to build a sanctuary on our existing property but that our continued growth will require future expansion and it will be in our best interests, if possible, to acquire the Northwest Bible Church property on Chapala, adjacent to our annex.
Our efforts will continue in the year 2000 as we acquire the services of an architectural firm to develop a formal design specification and detailed cost estimate of a new facility located just to the west of the existing Annex. The results of this activity will be brought to the congregation in another series of informational meetings, followed by a congregational meeting to determine which path we are to follow.
We have been led by the Lord in every step of our work. We have seen Him close some doors and open others. We will continue to pray for guidance and discernment in our efforts. We have been fortunate to have the assistance of talented members of our congregation who have given unselfishly of both their time and talents.
January 30th, 2000
Congregation Asked to Vote on Plan for Construction of New Church Facilities
Last spring the congregation directed the Joint Administrative Committee (JAC) and the Session to develop a plan for new church facilities, including a new sanctuary. Since then, the JAC has worked very hard to examine all possibilities. The JAC has now recommended to the Session that new facilities be constructed west of the Annex building on the property presently owned by St. Andrews and the property presently owned by the Northwest Bible Church if it becomes available. The Northwest Bible Church property is approximately three acres and includes a new building and two modulars. The proposal before the congregation is to authorize a total debt limit of $2.2 million.
The Session has called a Special Congregational Meeting for Sunday, March 26 at 5p.m. for the purpose of acting on this recommendation. The Session has directed the JAC to conduct special informational meetings and prepare detailed, written materials for the congregation to study regarding all aspects of the proposal. The information meetings will take place after all four services February 27 and March 5.
March 2000 Newsletter
March 26th, 2000
April 23, 2000
The following members have been selected to Building Committee
| Chair | Tom Cochran |
| Veteran JAC members | Jack Boire Bob Picker Bill Ricker Lee Farmer Bill Armstrong |
| Trustees | Rick Rollman Joyce Haugh |
| Ex officio | Joe Bettridge Karen Woodard |
| Building Committee Session Liaison | Tom Cochran |
| New Members | Carolyn Christian Greg Jester |
There will be many opportunities for congregational input during this process of designing our new church facilities. The committee will consult with all our various ministry groups. However, the Building Committee would like to receive any initial ideas and suggestions which you might have regarding the design of the new Sanctuary. Suggestions may be left in the Building Committees mailbox in the church office or may be sent by e-mail to standrew@azstarnet.com.
May 6, 2000
On Sunday, April 30, the Board of Elders of the Northwest Bible Church
concluded that their congregation does not support the sale of their property to St.
Andrews. The leadership of the NWBC had recommended the sale to the congregation and
had presented substantial information regarding the advantages of the proposed sale.
However, a large number of their members are not persuaded that relocating is the right
thing for their church. Accordingly, the Board of Elders canceled the congregational vote
that was to have taken place May 7.
The motion approved by the congregation of St. Andrews to proceed with building expansion anticipated this possibility. The Building Committee will now develop concepts for construction of a new sanctuary next to the Annex. It is our expectation that all of the current space needs can be met.
June 5, 2000
N.W.B.C. Decides No Sale!On Sunday, April 30, 2000, the Board of Elders of
the Northwest Bible Church met to discuss the proposed sale of their property to St.
Andrews. The pastor and church officers had strongly recommended the purchase to
their congregation for several months. The pastor advocated the purchase. An entire Sunday
was devoted to setting forth the advantages of the sale during which a multi-media
presentation was made outlining the advantages of going through with the proposal. The
purpose of the Elders meeting was to evaluate the level of support for the proposed
sale prior to a scheduled congregational vote on Sunday, May 7, 2000. The Elders of
Northwest Bible Church concluded that their congregation was sharply divided on the
question of whether to sell their property to St. Andrews and relocate elsewhere.
The Elders became concerned about the divisiveness that the vote on the relocation would
create within their congregation. At the end of their discussion, the Elders concluded
that the Northwest Bible Church did not want to subject their congregation to the division
that a vote might produce.
Obviously, this came as a great surprise to the St. Andrews Building Committee. Our church officers had put great effort and time into negotiating this purchase. Fortunately, a great deal of thought had also been given to this possibility and the alternatives that would be available should Northwest Bible Church decline to sell. Although it was not our first choice, the decision had already been made by the Joint Administrative Committee, the Session and the congregation that St. Andrews should proceed with new construction even if the Northwest Bible Church property could not be acquired.
As a practical matter the construction process will probably be simpler. There is still enough space for a new, attractive, and comfortable sanctuary. Furthermore, construction of the new sanctuary will relieve the overcrowding conditions in the classrooms and offices. Of course, we will also be relieved of the financial burden of acquiring the Northwest Bible Church property.
The right course of action is not always obvious to us, and sometimes we feel great disappointments over developments that we later discover were actually great blessings. The Building Committee will continue to proceed on this project with faith and confidence that we have a wonderful opportunity before us to build a beautiful sanctuary and provide sufficient classrooms and office space at St. Andrews so that we may achieve our mission statement: To Know God and Make God Known, Through Lives Transformed by Christ.
August 14, 2000
Seven site options have been presented. The site that has been selected is the
south east corner of the property. This provides a clearly defined entrance patio to the
southwest campus. Sanctuary seating was calculated as just over 900. Gospel Hall will be
retained. This option provides a good connection with the main campus, a sizable patio for
fellowship before and after worship service and the ability to expand in the future. The
parking discussion indicates that there are options to pursue that might gain enough
parking space to allow the construction of a new sanctuary with a seating capacity of
1000.
November 2000
Last month, Session appointed to the Capital Fund Committee the following people:
Jack Comp, Bill Ricker, and Rick Rollman (President, Board of Trustees). Dr. Joe Bettridge
and Karen Woodard (Business Administrator) actively participate as ex-officio members. The
task of the Committee is to raise funds for our new facilities. Our Capital Fund Campaign
is scheduled for January - March 2001. It will be the biggest financial challenge
undertaken in the history of St. Andrews. It is a challenge which our church family
will meet as we are led by the Lord. The Committee recognizes the importance of supporting
Stewardship 2001, now in progress under the direction of Elder Mike Lange, in fulfilling
annual budget requirements.
The upcoming Capital Fund Campaign is a time when members and friends of St. Andrews make a "forever" impact in transforming lives for Christ. We pray that the planned facilities, the final major physical expansion possible for our church, are tools through which future generations come to Christ, worship, disciple, study the Bible, and support mission and ministry. We will finance the building projects in a prudent manner, incurring debt only as allowed by the congregation at last years vote.
A successful Capital Fund Campaign will depend upon one-time up-front special gifts and three-year building fund pledges. In addition a promissory note program is planned. Over the years, our congregation has provided overwhelming support for the note programs in which members loan money to the church at a fair rate of interest. However one-time, up-front special gifts and three-year pledges are crucial to financing the new construction and renovation projects.
A dozen small-group meetings concerning the Capital Fund Campaign will occur between January 22 and March 11. All members will be invited to attend one of these meetings. We will know our exact financial capability by late March at the conclusion of the small-group meetings, and plans for groundbreaking will proceed.
Session, St. ABC, and the Capital Fund Committee will continue to keep the congregation advised. God be with us all!
December 2000
In January we will begin a series of small group meetings intended to prepare you
to participate in the funding of our new sanctuary and educational facilities. The capital
will be raised by three primary methods: 1. Upfront cash; 2. Three-year pledges; and 3.
Promissory notes.
Some of the upfront cash will probably consist of the transfer of appreciated securities. Many St. Andrews members are fortunate to own securities that have appreciably gained in value over the years. For some of us, selling these shares can be difficult, given the capital gain and attendant tax burden. However, these stocks make ideal instruments for church and charitable giving. We want to encourage those of you in this situation to consider a substantial gift to St. Andrews for our new building.
Many of you in the aforementioned group may prefer to spread your gift into more than one tax year. If so, you only have a few weeks to act. This is not intended to add pressure to our request for your gift, but to alert you to an important tax savings opportunity. For more information, consult your tax advisor, or call me, Jack Comp at 825-2754, or Karen Woodard at 297-7201. You can be sure that your conversation will be kept in the strictest confidence.
Peggy and I have been involved with several Presbyterian churches over the years, and earlier generations had always provided the facilities that we enjoyed. Now, it is our turn to pass a blessing on to those who will come after us. We believe that the intended facility expansion for St. Andrews is absolutely necessary for our future mission. We are satisfied that the architectural plans now in development will be beautiful and functionally sound. The opportunity to participate in funding this expansion comes at a time in our life when we have the resources to do something significant. Many in our congregation may be similarly blessed and we invite you to join us. Why wait until your death to leave your legacy? You can do it now while you can enjoy it, and tangibly demonstrate how much you care for this marvelous church of ours.
December 2000
Building Because We Care. After the New Year, members
and friends of St. Andrews will receive personal invitations to attend a small group
meeting to learn about the plans for our new facilities. Architectural drawings and
pictures of our new sanctuary and Christian education facilities will be displayed and the
financial plans for construction will be explained. Meetings will be presented by Jack
Comp, Bill Ricker, and Rick Rollman. The meetings are currently scheduled to take place
beginning in February. Further information will follow in January.
January 14, 2001
Preliminary Building Design Completed:
The St. Andrews Building Committee recently approved a design for the new sanctuary
and educational facilities. On the basis of this approval, the architect will complete
renderings and design perspectives. On February 19, the Capital Fund Committee will begin
conducting meetings to provide all members and friends of St. Andrews with
information regarding the need for new construction, the design features, the cost and the
plan for financing. Please plan to attend one of these meetings so that your decision
about your level of commitment will be based on an understanding of the need, the
proposal, and the cost. This project can proceed only with the generous financial
commitment of everyone.
January 28, 2001
Financial Commitment Sought For New Building
The St. Andrews Building Committee (St. ABC) has been working long hours to bring into reality our dream of new church facilities. St. ABC recently approved the schematic design for the construction of a new sanctuary and educational facility. The proposed building has been designed to make the most efficient use of the land available, in order to leave as much land for parking as possible. The new sanctuary will seat 940 people on a main floor and in a balcony. In addition, classrooms for young children will be provided in a lower level. A courtyard has been designed to enhance the corner of Chapala and Paseo del Norte, which will provide a connection to the existing campus, and a large open area for fellowship.
St. ABC must now determine whether there is sufficient financial support for this project. The Session has authority to borrow up to 2.2 million dollars toward the cost of the new construction, so the balance must be found in accumulated reserves and gifts designated for this purpose. Every member and friend of St. Andrews will be asked to make a financial commitment to this project. In order to provide the information needed to make this commitment, everyone will be invited to attend an informational meeting conducted by the Capital Fund Committee. We will conduct ten separate meetings beginning February 19. Everyone will be invited to attend a particular meeting. If you are not able to attend the meeting to which you are invited, please RSVP requesting a more convenient date.
March 2001
The Capital Fund Committee began holding small group informational meetings on February 19 which will continue until March 15. The meetings begin with a brief review of the current facilities and the options that have been considered by Long Range Planning Committee, Joint Administrative Committee, and the Session to relieve the overcrowding. The major portion of the meeting is devoted to a discussion of the proposed new sanctuary and education building design and financing of that project. During the meeting, the committee presents architectural drawings and renderings of the new building, floor plans, a brochure, and a fact sheet.
The meetings also provide an opportunity for members and friends of St. Andrews to make financial commitments to the project. The anticipated cost of the new building is approximately 4.5 million dollars, although the actual cost will not be known until the contract is awarded. The Session has been authorized by a congregational vote to borrow up to 2.2 million dollars in the form of promissory notes and/or a mortgage. The balance of the needed funds must be found in special gifts and accumulated reserves on hand.
Jack Comp, a member of the capital committee, has expressed confidence that the members and friends of St. Andrews have the resources to support the proposed construction and will agree to do so once they under-stand the needs, the proposal, and the cost.
The Capital Committee will report the total financial commitment received to the Session at a special meeting in early April. Based upon that report, the Session will decide whether or not to proceed with the construction.
March 18, 2001
Informational Meetings Completed: The St. Andrews Capital Committee has completed twelve informational meetings on the new facilities. Attendance has been beyond expectations. If you were not able to attend a meeting, or you have questions regarding the design or financing of the new facility, the Capital Committee will be available to meet with you after each worship service next Sunday, March 25, in Friendship Hall.
The informational meetings concerning our Building Because We Care campaign have now been concluded. The St. Andrews Capital Committee will report to the Session early this month on the campaigns results. If you have not already submitted your commitment letter for this project, please do so as soon as possible so that your information can be included in the totals. If you were not able to attend an informational meeting and would like to receive a brochure and/or a commitment letter, please call the church office at 297-7201. We will mail you the brochure, which describes the proposed new building with drawings and floor plan.
On Thursday, April 5, the Capital Fund Committee will report to the Session on the results of the Capital Campaign. Session will then evaluate the dollar amounts committed to construction of the new sanctuary and educational facility. Please return your commitment letter now! Significant aspects of construction are affected by the level of financial support received. If all commitment letters are received before Thursday evening, prospects of meeting our target dates and construction schedules are improved.
April 5, 2001
Building Because We Care: The St. Andrews Session
voted on April 5 to proceed with the construction of our new facilities. The St.
Andrews Building Committee (St. ABC) will continue to consult with various
ministries and our architects to fine-tune the design. Thank you to all the members who
have generously supported the Capital Campaign. For those who have not yet submitted a
financial commitment letter or wish to review the brochures, they are available in the
church office.
April 22, 2001
Building Because We
Care: The construction of our new facilities has been approved by Session. The St.
Andrews Building Committee (St. ABC) will continue to consult with various
ministries and our architects to finalize the design. Thank you to all who have generously
supported the Capital Campaign. For those who have not yet submitted a financial
commitment letter or wish to review the brochures, they are available in the church
office.
May 12, 2001
Building Because We Care: The St. Andrews Building
Committee (St. ABC) continues to consult with various ministries and our architects to
finalize the design of our new sanctuary and educational facilities. Thank you to all who
have generously supported the Capital Campaign. If you have not yet made a financial
commitment, or wish to review the brochure, please visit the church office.
June 9, 2001
| The St. ABC Stained Glass Subcommittee has
purchased twenty stained glass windows from First Congregational Church, which was being
torn down. The purchase consisted of the following: The
Life of Christ, a series of nine windows, each 3 feet by 9 feet; The 23rd Psalm, a series of five windows, each 30
inches by 56 inches; The 119th Psalm, a single window, 21 inches by 34 inches. The purchase was made after the windows were inspected by
the Committee and the architects. All agreed that these windows could easily be integrated
into the design of the new sanctuary. They will add much to the traditional atmosphere of
our worship space. The I Am the Light of the World panel has been mounted in a
display built by Elders Don McGaughey and Bob Picker. You can see the display, which
includes photos of all the windows, in Gospel Hall this morning, or in the Chapel next
Sunday. |
July 13, 2001
We have signed a contract with Gresham & Beach for the completion of the architectural work on the new facility upgrade. With this contract they will take the completed Schematic Design and develop a Detail Design and Construction Documents suitable for a General Contractor to use both for generating a bid for the work and for the actual construction. In addition, the architects will assist us in the bid and general contractor selection process and will work with us during the actual construction phase. We are hopeful that the Ground Breaking will take place in the early months of 2002 and that the new facilities will be ready for use in the very late part of 2002 or the early months of 2003.
The renovation of Gospel Hall and its conversion to a Fellowship Hall which will both support and complement the Worship and Children's Christian Education ministries on the Southwest Campus has been and continues to be the main focus of the St.ABC. The space is limited, just 6,300 sq.ft., and the possible uses are many. Your prayers are needed to help us discern how to best use this space.
The Organ Decision
The Session has authorized the Board of Trustees to enter into a contract for removing,
rebuilding, and expanding our current pipe organ for inclusion into the new
sanctuary. Our pipe organ will be an excellent and much improved and enlarged
instrument at the end of this process. This will provide our new sanctuary with the
classic qualities of a historic pipe organ
that will be an integral part of worship. The work is to be accomplished in two phases;
the first funded by monies already on hand in St. Andrews organ fund; the second to
be financed by a special donor. Should this contract and
donor agreement not be completed by July 18, the Session will move to enter
into a contract for a digital organ.
The Worship & Music Committee, St. ABC, and others, conducted an in-depth study into
the merits of both pipe organs and high quality digital organs. This is a very complicated
and technical issue. At a special Session meeting on May 31 the Elders considered all
sides of this issue. They looked at both pros and cons, and made a final decision
considering the merits of
each case. Paramount in their decision was the mission statement of St. Andrews to
see lives transformed by Christ as well as the application of sound Christian Stewardship.
Decisions such as this provide ample evidence of the wisdom of our Presbyterian heritage
and practice. We seek the truth through the guidance of the Holy Spirit. We believe that
God is in the midst of our Sessions deliberations as we seek to make wise decisions
that honor Jesus Christ and promote His Kingdom.
July 27, 2001
A digital organ in the new sanctuary
After several months of study, the Worship and Music Committee in May proposed that the session contract for a rebuilt pipe organ in the new sanctuary. The session concurred and requested Trustees to contract with a local builder to remove the current organ, rebuild it, and expand it to 53 ranks. The proposal made to us by the organ builder included his commitment to secure a donation from an anonymous donor. By Session motion, the builder had until July 18 to sign a contract and show evidence of the funding by the anonymous donor. If the conditions of this proposal could not be met, the Session in its exercise of sound stewardship, instructed the Building Committee to proceed with the installation of a new custom digital organ. The cost of the digital instrument lies within our ability to pay.
Members of the building committee worked extremely hard in June and early July to reach an agreement with the organ builder and the proposed donor. Ultimately it became clear that no such agreement could be reached. Therefore, we will have a modern, new and custom digital organ to provide music to support choir and congregational singing in the new sanctuary. The digital instrument will perform to our combined satisfaction and at a cost we can afford. Digital organ design and manufacture have progressed immensely in the past decade. They are able to produce nearly identical sounds to that of the pipe organ. They are much less expensive to maintain and occupy considerably less space than the pipe organ. Even though the pipe organ has hundreds of years of history in providing quality sound, the digital is not far behind. Save for those with strong emotional and experiential attachment to the pipe, the vast majority of St. Andrew's worshippers will find the digital organ satisfying and beautifully pleasing.
Signing a Contract
St. Andrew's has signed a contract with Gresham & Beach for the completion of the architectural work on the new facility upgrade. With this contract they will take the completed schematic design and develop detail design and construction documents suitable for a general contractor to use both for generating a bid for the work and for the actual construction. In addition, the architects will assist us in the bid and general contractor selection process and will work with us during the actual construction phase. We are hopeful that ground breaking will take place in the early months of 2002 and that the new facilities will be ready for use later that same year or by early 2003.
Meanwhile the renovation of Gospel Hall and its conversion to a Fellowship Hall to support and compliment the Worship and Children's Christian Education ministries on the Southwest Campus has been and continues to be the main focus of the St. ABC. Space is limited, Just 6300 square feet and the possible uses are many. Your prayers are needed to help discern how to best use this space.
August 4, 2001
Final Phase of Fundraising for New Sanctuary and Education Building
We are now beginning the final phase of fundraising for the new
sanctuary and education building. We have $1,600,000 on hand to apply to the construction
cost. In addition, we have received pledges of $647,974 to be received during the next two
years. We must now determine whether we can raise the final $2,200,000 through the
Promissory Note Program, or if we must borrow from an outside lender. If we borrow that
amount from a commercial lender, we estimate it will cost the church approximately $60,000
more per year in interest than if we raise the funds through the Promissory Note Program.
The church has used the Promissory Note Program to raise funds on two
separate occasions in the past. The first time it was used was in 1990-1991 to pay off the
remaining debt resulting from the construction of Westminster Hall and the Sanctuary
transepts. All of the notes were paid within five years. It was again used in 1996 in
order to pay for the acquisition of the Annex. Those promissory notes were paid off in
1999.
This time, we will offer promissory notes in three different
maturities, each bearing a different interest rate:
| Five (5) year notes will be offered at an
interest rate of 4.75%. A total of $500,000 will be sold in this amount. |
| |
| Fifteen (15) year notes will be offered at an
interest rate of 6.5%. A total of $1,000,000 will be sold in this amount. |
Quarterly interest will be paid to the holders of all of the
notes. The principal will be paid to the holder on or before maturity. All of the notes
may be redeemed by the church at any time. The Budget Committee has agreed to allocate at
least $240,000 for the payment of interest and to redeem some of the notes every year.
This amount will be sufficient to permit all of the promissory notes to be redeemed on or
before the maturity date. The Session may, if there are sufficient funds available,
allocate more than $240,000 per year for the purpose of redeeming the notes. In that
event, the notes will be paid off early, as happened with the last two note programs.
We need to estimate now whether we will be able to sell all
of these promissory notes within the church. In order to do that, we need your help in
responding to a questionnaire that will be sent to each of you. Please fill out the
questionnaire and return it to us as soon as possible, but not later than August 22, 2001.
On the basis of the response to the questionnaire, we will determine whether we must now
begin to make arrangements with an outside lender, or if we will successfully obtain the
necessary funds through the Promissory Note Program.
Please understand that the questionnaire we send to you is
not an offer to sell promissory notes, or a solicitation of a commitment from you. Your
response is an expression of interest only and does not commit you to purchase any
promissory notes in the future. The officers of the church are not qualified to provide
investment advice to you and, accordingly, have been asked not to do so. If you feel you
need investment advice regarding the decision to purchase promissory notes, please consult
with your own investment advisors.
August 23, 2001
Promissory Note Program Planned
At a congregational meeting on March 26, 2000, the congregation authorized the church to borrow up to $2,200,000.00 as part of the total $4,500,000.00 cost of construction for a new sanctuary and remodeling of Gospel Hall. Although the church has utilized a Promissory Note Program on two prior occasions, once in 1990 to refinance the cost of Westminister Hall, and again in 1996 to finance the acquisition of the Annex new regulatory requirements have now been imposed on churches. The new requirements have been imposed as a result of the Arizona Baptist Foundation scandal.
The church has retained a security lawyer who is not associated with the church to prepare the necessary documents to comply with these new state requirements. In the meantime, the Building Committee is trying to determine the level of interest in a Promissory Note Program, and whether there will be a need to seek a loan from a commercial bank. In order to avoid a high interest rate a bank will charge, it is hoped the Promissory Note Program will provide all needed funds. A questionnaire has recently been sent to determine the level of interest in the Promissory Note Program. If you received the questionnaire, please return it promptly. If you did not receive a questionnaire, but you have an interest in the Promissory Note Program, please contact the church office and request to have information sent to you.
October 9, 2001
ORGAN UPDATE
by Chuck Wachsman & Marshall Sanders
Several weeks ago we completed an extensive search for the best digital organ for our new sanctuary. After looking at several options, and visiting many churches, we recommended to Session that St. Andrews purchase a four-manual Allen Renaissance, Model 460. This recommendation was confirmed by Session and a contract was let, securing our price and manufacturing schedule. Since that time, the Allen Organ representatives have met with our technical staff, and with our architects to assure that the installation will be of utmost quality and that the needs of the churchs diversified music program will be met.
The digital organ produces sound in a way that quite effectively replicates the sound of real pipes. It projects digital reproductions of actual pipes into the sanctuary through a wide array of carefully placed speaker cabinets. Using the latest technology of digital recording, these sounds are scattered throughout these banks of speakers in a similar fashion to pipes being spread across a range of several feet. The sounds will blend together in an organ chamber (an acoustically designed room above the choir loft) and project into the sanctuary, allowing the rooms superb acoustics to then embellish the sound further, providing both inspiring and meditative environments. All the speakers (most in the front, and some in the rear) will be carefully integrated into the buildings design, completely hidden from view.
Over the years, Allen has been recognized as a leader in designing digital organs that are both musically satisfying and cost effective. Our particular instrument will have a huge diversity of sound colors, allowing for virtually any type of literature to be played, equivalent to well over 100 ranks of pipes. The console itself will be a beautiful addition to our new worship landscape, as the workmanship is all done at the Allen factory by gifted wood-workers. It will be finished to match the other interior woods of the chancel area.
STATUS OF FINANCING
As the beginning of construction approaches, plans for completing the financing are being
finalized. As in the past, the Promissory Note Program will be the principal means
of raising funds to complete construction. But it is anticipated that the church
will not be able to raise the full $2.2 million needed through promissory notes issued by
St. Andrew's. Fortunately, however, St. Andrew's has learned of a new organization
created by the Presbyterian Church to assist in the construction of churches throughout
the country. This organization, known as the Presbyterian Church Investment and Loan
Program, Inc., is interested in lending to St. Andrew's the amount needed to complete
construction which cannot be raised through a local promissory note program. A
condition, however, of a loan from this organization is that St. Andrew's and its members
provide investment support to it. This is a mutually beneficial arrangement.
Interest is paid according to a published schedule on investments made by St. Andrew's and
its members. These investments permit the organization to make loans for
construction of churches. The interest rate that will be charged to St. Andrew's
will depend on the amount St. Andrew's and its members invest. The CEO of this
organization will be at St. Andrew's on Sunday, January 20, 2002 to explain the program
and answer questions you may have.
The opportunity to obtain a loan from the Investment and Loan Program gives St. Andrew's
welcomed assurance that all necessary funds needed to complete construction of the
sanctuary will be available.
November 8, 2001
As you might expect the Chancel area is the
most complicated part of the Sanctuary because it is the focus of the Worship Service and
has to support both Contemporary and Traditional. The St.ABC is working with the Gresham
& Beach Architects, their consultants and engineers and the Audio/Visual Subcommittee
of the St.ABC to insure that we have adequately planned the intricate details, both for
the present and future uses of the Sanctuary, in the areas of Audio, Chancel and Sanctuary
Lighting, and Video Projection. Additionally we have been working with Allen Organ to
integrate the new
digital organ into the existing design.
We have been working with Pima County, through Gresham & Beach, to have a strip of the
Chapala Drive Right-Of-Way abandoned by the county so that we might purchase it for
additional parking. This effort has progressed well and should be approved by the Pima
County Board of Supervisors this month. The strip of Right-Of-Way is 20 feet by 450 feet
and equates to 31 parking spaces.
The Development Plan, which is equivalent to a our building permit, was submitted to Pima
County in early October. The County is finishing its first review this month. There will
be several reviews before the plan is finally approved. Early feedback from the architects
indicate that there are no 'show stoppers' in the review process.
December 15, 2001
On December 4th the County Board of Supervisors approved St. Andrew's request to purchase a 20 x 450 foot section of the Chapala Drive Right-of-Way which we will use for additional parking (31 spaces) for the Facility Upgrade.
The Development Plan, our equivalent of a Building Permit, has completed the first round of reviews by the Pima County Departments. To date the only significant correction has been the addition of an Archeological Survey of the property.
The St.ABC is working with its Audio/Visual Subcommittee, chaired by Jack Comp, to finish the design of the Sanctuary and Chancel lighting, the projection system for the Contemporary Worship Service, the Audio System and the integration of the Allen Digital Organ into the Chancel design. This work is about complete and the Gresham & Beach architects will incorporate these items into the Construction Documents which will be used for the Bidding Process.
We expect to have the Construction Documents completed and ready for the Bidding Process by early June. The Bidding Process will take several months. We should be in a position to make an award to a General Contractor in early September 2002. We will have to demonstrate that we have all of the project funding at this time. Construction should be completed in 12 months with our use of the new facilities in September of 2003.
January 20, 2002
BUILDING PROGRESS. . . SLOW & STEADY
Progress on the design of the new building continues at a slow but steady pace. The actual
design work has slowed during the last few months while the committee evaluated advice
received from various consultants regarding acoustical features of the new sanctuary. The
committee learned that some design features will enhance and enrich the presentation of
traditional music, while other design features can improve the clarity of the spoken
word. At the same time, some design features used to clarify the spoken word detract
from the quality of music, and vice versa. It is, therefore, necessary to select design
features with great care.
The Building Committee found the task to be far more
difficult than anyone expected. In order to reach appropriate decisions, the
committee relied upon advice from a nationally recognized acoustical engineer in Los
Angeles, as well as a nationally recognized audio engineer. After conclusions were reached
and design criteria were selected, the committee then solicited a second opinion from a
nationally recognized acoustical engineer in Denver to verify that wise decisions had been
made.
The committee has now completed most of the work that it
must do on design criteria for the sanctuary, and the architects have resumed preparation
of construction drawings. Additional work still must be done by the committee on interior
finishes and furnishings, as well as exterior features.
The architects now expect to complete construction drawings
by late spring. At that time, contractors will be invited to bid on construction. It is
possible the construction will commence in September and be completed in time for
Christmas 2003.
The Building Committee has received several estimates on the
expected cost of the new building. The most recently obtained estimates have hinted that
the ultimate cost may exceed the anticipated budget of $4.5 million. The actual cost will
not be known until a construction contract is signed. However, the committee will consider
design alternatives and phasing of construction in order to stay within the budget of $4.5
million.
Financial
support for the new building remains very strong. As a result of very generous
contributions already received, the church has now accumulated $1.9 million to be applied
towards construction costs. In addition, pledges have been made to give another $600,000
within the next two years. The balance of the financing to complete construction is
expected to be received from the Promissory Note Program, which will commence next fall
when the funds are needed, and from a loan to be obtained from the Presbyterian Loan and
Investment Corporation.
April 21, 2002
The St. ABC interviewed six local
contractors who have expressed an interest in and are capable of building our new
sanctuary. We are now in the process of talking with their references and evaluating their
past work and current financial condition. The six companies are: Chestnut, Diversified,
Division II, Lang Wyatt, Lloyd, and Sundt. All six believe that we will be able to use
Gospel Hall for the major part of the construction period. All six have worked with our
architect, Gresham & Beach. We expect to have the selected construction company in
place soon. The contractor will work with our architects during the completion of the
construction documents to maximize cost savings. We are still planning on breaking ground
in September 2002.
May 16, 2002
Arizona Daily Star Article On Our Building's Architect
May 20, 2002
The St. ABC has interviewed six local contractors who have expressed an interest in and are capable of building our new Sanctuary and Childrens Sunday School facility. The six companies are: Chestnut, Diversified, Division II, Lang Wyatt, Lloyd, and Sundt. We have reviewed their financials and talked with their references. All six have worked with our architect, Gresham & Beach. ( Click here for information on Gresham & Beach ) All six believe that we will be able to use Gospel Hall for the major part of the construction period.
We have begun negotiations with Sundt to become our Construction Manager/General Contractor. ( Click here to view the Sundt webpage ) An important reason for choosing Sundt is because they took the time to visit our site and made a presentation that showed an interest in and an understanding of our construction plans as evidenced by their proposal to enclose the site by building the planned wall first rather than the usual construction fence. This will contain the construction process; shield the mess and the sound from the neighborhood. Further, they plan on an informational and safety presentation to the two nearby schools. They have an excellent reputation, excellent financials, and excellent references.
Sundt will work with our architect during the completion of the Construction Documents to maximize cost savings. We are still planning on breaking ground in September 2002.
FINANCING
The original financing plans for the new construction anticipated that St. Andrews would sell 5-year promissory notes to the congregation. This method of financing, relying entirely on our own membership, has successfully been used in the past and has allowed the church to avoid the much higher expense of bank financing. Unfortunately, the amount to be borrowed for this project cannot be repaid in just 5 years without curtailing existing ministries. In order to keep the annual repayment expense within our budget, we will need as long as 20 years to fully repay the mortgage debt. We have located a source of financing from the Presbyterian Investment and Loan Program that is much less expensive than bank financing and will provide favorable terms with 20 years to fully repay the debt. We hope, and based upon past experience we expect, that the mortgage will be repaid much sooner than that. But that will depend on an increase in future contributions.
Further discounts on the cost of financing may be available with your help. The Presbyterian Investment and Loan Program ( Click here for more information on the Presbyterian Investment and Loan Program ) is in business for the sole purpose of helping local congregations construct new church buildings. This depends, in part, upon the purchase of investment notes by Presbyterians across the country in order to finance its activities. It rewards churches whose members are particularly supportive of it by reducing the financing cost of construction loans to those churches. If a significant number of members of St. Andrews purchase investment notes from the Presbyterian Investment and Loan Program, the interest rate charged to St. Andrews may be reduced by up to 1%.
The President of Presbyterian Investment and Loan Program will make a presentation at St. Andrews on September 15, 2002, to provide further information about this program.
June 30, 2002
Greg Jester & Tom Cochran of the StABC
building committee are working with Gresham & Beach and the Sundt Corp. to refine the
cost estimate of the Facility Upgrade. We are planning on negotiating a
The more detail, the better the
understanding of the design and the better the cost estimates. For example, one cost
estimate for the sanctuary ceiling was over $400K. Further investigation showed that the
estimator had considered the entire ceiling to be vaulted at a cost of $35/sq.ft, when the
architect and the acoustic engineer had specified that only the portion of the ceiling
over the congregation seating area was to be vaulted. Similar costing estimates are being
investigated in the areas of; the types and cost of glass, use of HVAC, interior and
exterior finishes, site work and electrical work.
The 85% Construction Document Review is
scheduled for July 25th, we feel that after this review we will have a much accurate total
cost estimate and the areas bearing detailed scrutiny will be at a minimum.
Greg Jester & Tom Cochran continued
working with Sundt and G&B to reduce costs while G&B continued working on the
Construction Documents. An example;
G&B have completed the 85% Construction
Documents and these have been given to Sundt to develop a cost estimate with their
potential subcontractors. We expect Sundt to have a preliminary Guaranteed Maximum Price
(GMP) by early September. We plan to present a draft contract to Session in late
September. With Session approval to proceed we could have a Ground Breaking around
September 23rd, thus keeping to our original schedule.
|
September 25, 2002 The building of the building has been delayed. Read the letter from the Session for the details. Building... because we care The Session of St. Andrew’s Presbyterian Church has decided to move forward in faith to seek $1.6 million in additional Capital Fund pledges in order to undertake our building program. It is certain that God will be pivotal to our campaign and that we shall see “miracle upon miracle.” Several issues will be explained to you in full as the campaign unfolds. They are: A) Memorial and Special Gifts: A full list of opportunities will be made available to the entire congregation. You will be able to combine your past gifts with your future gifts to remember “loved ones” who still live in your hearts and minds, or to honor friends and family. Lee Farmer, 299-3174, and Karen Woodard, 297-7201, will be available for consultation. B) Your existing pledges to the Capital Fund may be adjusted and extended to reach into the future in support of our new facility for ministry. C) New pledges: If you have not already pledged to the Capital Fund, you will be given a new opportunity as we move into the future. Bill Ricker, 795-0477, and Karen Woodard, 297-7201, will be pleased to assist you on this. D) Charitable estate planning and planned giving: Opportunities will be offered for anyone interested in exploring these important, tax-saving vehicles for stewardship through personal consultation and seminars. On November 14, two seminars will be offered in Friendship Hall, a breakfast seminar at 9a.m. and a dinner seminar at 6:30p.m., by the law firm of Taylor, Hillman & Shelby, LTD. Everyone is welcome. (RSVP church office.) Watch for more information and save the date. E) The replacement of the “promissory note”: The Presbyterian Investment and Loan Program will replace the promissory note initiative as a means to help fund the building program. Watch for further information. A “question and answer” forum will be held on Sunday, November 10, at 5p.m. in Friendship Hall. Please send your questions to Claudia Harbers at the church office, or bring them to the meeting. We hope this meeting will leave no question unanswered. Dedication of pledges and gifts will take place on Thanksgiving Sunday, November 24, at all services. Memorial and Special Gifts may be given over an extended time period, while estate planning should be done with your attorney or CPA, or begun by attending our charitable estate planning seminar November 14. You will be receiving much information in the days ahead. You are encouraged to give prayerful thought and consideration to your role in helping this church of Jesus Christ grow as a part of God’s family in order to bring the mission and ministry of St. Andrew’s Presbyterian Church to our community and to the world. Frequently asked questions Below is a sample of the questions being asked about the building process. A complete list of questions and answers will be made available to the congregation in the worship bulletin or in the office on November 3. Please plan to attend the informational meeting in Friendship Hall on November 10, at 5p.m. Representatives from the St. Andrew’s Building Committee, the Capital Fund Committee, and Elders will be available to answer your questions. Q. Given our cost predicament, what is the feeling of Session on how best to proceed? A. Session held a special meeting on September 21, 2002, with St. ABC to discuss the overall project status. With full awareness of cost estimates exceeding our budget, the Elders unanimously voted to proceed with the project as designed. The Session’s vote was based, in part, on the following:
Q. Why have costs increased $1.6 million? A. There are several reasons for running over budget.
Q. Have we received competitive bids? A. Competitive bids from subcontractors have been received. There have not been competitive bids, in the classic sense, from general contractors. We followed the recommendation of our architect by interviewing various general contractors capable of managing a project of this size. Sundt Construction was selected from that group. Sundt has brought to us the best prices from subcontractors interested in doing the work. Session is satisfied that Sundt has worked hard to bring in the lowest responsible bids, and that the guaranteed maximum contract the best way to limit our risk of cost overruns during construction. Session and the St. ABC are also satisfied with Sundt’s outstanding reputation for integrity and quality work, qualifications which cannot be guaranteed by simply going for the low bidder. Below is the content of a brochure from our building committee. Building...because we care
History of the Building Process · Early planning dates back to the mid-1990’s through the work of Session’s Long Range Planning Committee and Joint Administrative Committee. The committees and staff analyzed facility use and the need for new facilities. Projections regarding demographics and church growth were made, and a series of information meetings were presented to the congregation in early 2000. In March 2000, a congregational meeting was held in which our members voted to build new church facilities, including a new sanctuary, classrooms, and a remodeled Gospel Hall. · Session immediately established a building committee. Since April 2000, the St. Andrew’s Building Committee (“St. ABC”) has been at work. Tasks of St. ABC have included gathering input for design from members and staff, selecting an architect, assisting in the devising and revising of architectural plans, monitoring costs, and arranging financing. Session has received regular briefings by St. ABC and has granted repeated authorizations for continuing work on the new facility. Drawings and models of the new facility have been presented to the congregation at information meetings and in various mailings. · Final construction drawings are due from the architect on November 8, 2002. The obvious and central problem is that the cost of the project has risen to $6.1 million as of September 5, 2002, approximately $1.6 million beyond early estimates. Our early estimate totaled $4.5 million and was to be funded by $2.2 million in borrowing, $1 million from what we had on hand, and $1.3 million that was pledged during Building…because we care 1. · We need to raise more money before breaking ground. Session Decision on September 21, 2002 Q. Given our cost predicament, what is the feeling of Session on how best to proceed? A. Session and St. ABC held a special meeting on September 21, 2002, to discuss the project status. With full awareness of cost estimates exceeding our budget, the Elders unanimously voted to proceed with the project as designed. The Session’s vote was based, in part, on the following: • The need to take a long-term view of St. Andrew’s mission and facilities for the next ten to fifteen years and beyond. • The historical perspective of this church. - Forty years ago, a small congregation with a vision built the existing Sanctuary to seat nearly three times the number of members at the time. - In 1980, the congregation stretched beyond its means with the vision to build Westminster Hall and the Sanctuary transepts. The Building Project Q. What is the new facility that we are building? A. Sanctuary and Christian Education Facility. • 960-seat Sanctuary, including a balcony. • Lower level for classrooms and educational space. • Renovation of Gospel Hall Q. Where will the new facility be located? A. Directly south of the Annex property on the
southwest corner of Q. How big is the new building? A. 35,000 square feet. Costs Q. What is the total cost of the project? A. As of September 5, 2002, with bids from the various sub-contractors being received, total cost is $6.1 million. Q. Why have costs increased $1.6 million? A. For several reasons: • First, the size of the planned Sanctuary was increased after the initial plans were drawn, including the addition of a balcony to accommodate 960 worshipers. • Second, increased size of the Sanctuary added more square footage to the lower level. • Third, additional restrooms were desired. • Fourth, the HVAC equipment was placed in a separate structure to reduce noise and provide a quieter Sanctuary. • Fifth, building costs have increased since St. ABC was formed two and one-half years ago. Q. Why was the size of the new building increased after the initial plans were drawn? A. To ensure that the facility has adequate worship and chancel space, sufficient restrooms, and optimum utility locations. Q. Where does the cost of $6.1 million come from? A. Since October 2000, St. ABC has worked with the architect and the contractor to receive seven different cost estimates. We believe the estimate of $6.1 million received on September 5, 2002, is the most accurate because construction drawings are nearly complete and the contractor has gotten the best costs obtainable from its suppliers and subcontractors. Q. What is being done to reduce costs? A. St. ABC continues to explore ways to reduce costs without sacrificing critical functions. Q. Why did St. ABC choose Sundt for our building contractor? A. Sundt was chosen for their reputation and experience in church building. So far they have proven to be an excellent partner. Q. Have we received competitive bids? A. We have received competitive bids from subcontractors, but there have not been competitive bids, in the classic sense, from general contractors. We followed the recommendation of our architect by interviewing various general contractors capable of managing a project of this size. Sundt Construction was selected from that group. Sundt has brought to us the best prices from subcontractors interested in doing the work. Session is satisfied that Sundt has worked hard to bring in the lowest responsible bids, and that a guaranteed maximum contract is the best way to limit our risk of cost overruns during construction. Session and St. ABC are also satisfied with Sundt’s outstanding reputation for integrity and quality work, qualifications which cannot be guaranteed by simply going for the low bidder. Q. How do we know there will not be further cost increases? A. St. Andrew’s will sign a Guaranteed Maximum Price (GMP) contract. Our maximum price will be stated in the contract, and that will be the limit of St. Andrew’s obligation. If the contractor underruns the GMP, St. Andrew’s and the contractor will split the underrun. If the contractor overruns the GMP, that is the contractor’s risk. Q. What is the average markup on a Guaranteed Maximum Price contract? A. With a guaranteed maximum price contract, there is no “markup” other than the contractor’s profit margin. The risk of cost overruns is on the contractor (Sundt), while the church and Sundt will share any possible savings. This gives the contractor an incentive to keep those costs down. Q. What is Sundt’s profit, and how do we know that another general contractor would not be willing to do the same work for less? A. The general “rule-of-thumb” is a contractor fee of 8%. Sundt has proposed a fee of 5%. Financing Q. How will the new facility be financed? A. From four sources: • Cash on hand • Continued receipt of Capital Fund pledges from Building…because we care 1. • Borrowing $2.2 million as approved by Congregational vote in March 2002. • Additional capital contributions and memorial gifts from Building…because we care 2. Q. Can we borrow more money? A. Our lender indicates that we could borrow more based on our generally favorable financial position, track record in managing debt, and conservative manner of handling finances contrasted with other churches in our denomination. Our church officers have expressed a desire to avoid further debt, if possible, to avoid negative impact on our ministries and annual operating budget. Even in these times of economic recession and stock market decline, Session has decided to make an attempt to raise more cash through contributions and memorial gifts. Q. Who will be our lender? A. The lender is the Presbyterian Church Investment and Loan Program, Inc. (“PILP”). This is an organization established by our denomination to help Presbyterian congregations build new churches. Ken Grant, an ordained minister and president and chief executive officer of PILP, is our main contact. Ken has met with us several times since September 2001 and remains a collegial supporter of St. Andrew’s. Q. Will we offer promissory notes to St. Andrew’s members as we have done in previous building projects? A. It is not possible, for both legal and financial reasons, to use our traditional congregational note program to fund this construction project. • Because of recent accounting scandals, in particular the Baptist Foundation collapse, the State of Arizona has removed the exemption that churches had enjoyed from securities laws. This means that our note program would be considered to be an investment security and must, therefore, be handled in compliance with state security laws. Chief among such laws is the requirement of registration of the offering with the Arizona Corporation Commission. • One of the requirements is that our notes be secured by a first lien against the church’s land and buildings. Because our primary funding is expected to come from the Presbyterian Investment and Loan Program (PILP), and because PILP also requires that its lien be in first position, we cannot satisfy the first-lien requirement. • Repayment of short-term notes is not financially feasible. Because most of the subscribers desired a five-year repayment, the annual debt service requirements would have been far greater than we could comfortably project for our operating budget, something on the order of $300,000 per year for the notes, in addition to the first lien payments to PILP, which we estimate at $220,000 per year. The Capital Finance Committee believed that this annual repayment obligation would have unduly restricted our ministries and operations. Q. Is there a way for members to loan money to support the project? A. Members who wish to loan funds to support the project do have an option. They may invest in PILP in the same way they would with our own note program. PILP’s lending program is funded by a combination of funds invested by Presbyterians throughout the country and funds loaned by commercial institutions. PILP is already registered with the Arizona Corporation Commission. IRA funds may be used for purchase of PILP’s notes. The benefit to St. Andrew’s is that the more investment money placed by our members with PILP, the lower our interest rate will be on the loan. Rev. Ken Grant, PILP’s CEO, will be at St. Andew’s in early 2003 to fully explain the PILP program and its benefits. Q. How does PILP help St. Andrew’s reduce the interest on the church loan? A. In order to obtain financing with PILP the church must have invested 20% of the loan amount with PILP. As the members of the church invest more than the 20% base, the church will receive an interest rebate of up to 1% if the invested amount equals the loan amount. Other Q. How do we know that this facility upgrade is right for us? A. The best and most honest answer is that we continue to trust in the Lord. The membership has been well served on this question over the years by our pastors, staff, Session, other church officers, and building committee members. All of the complicated facets of this question have been open to much discussion. Members should also be encouraged by the very recent faithful action of our Session, perhaps most evident in the special meeting of September 21, 2002. Q. There are empty seats at most Sunday services. Are we sure about the need for our new facility? A. Yes. Led by faith and the knowledge that our new facilities are presented to God’s service, we remain very confident that God is growing St. Andrew’s. Studies of church growth show that when a congregation reaches capacity for its facilities, growth stops and even declines until facilities are expanded. We reached capacity in worship space two or three years ago, when the decision to build was made. The plateau in our attendance since then is consistent with the studies and with the need to build a larger sanctuary to accommodate our future needs. Q. If we are behind in receipt of general fund pledges, how can we afford a larger debt? A. We are trying to avoid a larger debt by asking for additional capital fund pledges and memorial gifts. Our debt limit is still set at $2.2 million. We expect the economic cycle to improve, the congregation to grow, and God, through the faithful, to provide. Q. In early 2001, a successful capital campaign raised $1.3 million in pledges. Do we really have to do this all over again? A. We do hope this isn’t “doing it all over again.” It is Session’s intent to inform the congregation of economic reality and to lead the congregation to do its best in the circumstances that are presented. If individuals who have pledged already can increase their pledge, or extend their pledge, our situation will be greatly enhanced. Nearly 50% of the “giving units” in our congregation did not pledge to the capital campaign in early 2001. Presbyterian sources across the country tell us such a dynamic is typical, but we believe that enormous potential exists in individuals who have not yet pledged. We are led by God’s grace, and we know He will provide. Q. What is the impact on staff? A. The congregation of just 15 years ago is different from the congregation today in terms of both numbers and depth of spiritual commitment. So it is with the staff. As our congregation grows in a new facility providing many new opportunities for spiritual growth, it is true that staff requirements will also grow. This is expected. Q. Are we building “big enough”? A. We are maximizing the site that is available to us. Q. Are we planning adequate classroom space for students, young and old, in the future? A. The design makes maximum use of the site to ensure that we have as much classroom space as possible. Session and St. ABC are very satisfied with the design and space configuration. Q. Will some children be in Sunday school on the current main campus (i.e., “northeast campus”)? A. Our youth, grades 6-12, will remain on the current, main campus. The youth will continue to use Westminster Hall. Q.How will our existing facilities be used after the other facility is completed? A. We expect continued use of the present Sanctuary for weddings, memorial services, and other smaller special services. Transepts will be used as meeting rooms or small group events.
November 5, 2002 On November 10, 2002 St. ABC sponsored an informational meeting which was enthusiastically attended by nearly 400 members of the church. A thorough discussion of where we are and where we are heading (with a question and answer session) was preceded by a 12 minute video highlighting many of the activities in the church which will be supported by the "Building Because We Care" campaign. Stand by for an announcement when the video will be shown following church services. November 24, 2002
Listen to, Or Read, Rick Rollman's
Assessment Of The Fund Raising For Our New Building
November 27, 2002 St ABC has reached a milestone with the completion of construction documents and the selection of a General Contractor. The additional funds needed to move ahead with the signing of a construction contract appear to be nearly on hand. A date for ground-breaking will be set as soon as the fund drive is complete. December 5, 2002 With Tom Cochran's leadership of St ABC we have completed the arduous task of establishing a workable location for our new sanctuary/Sunday school facility, selecting an architectural firm, selecting a general contractor, and finishing the Construction Documents. Tom is passing the baton to Dick Backus to lead the Building Committee through the final stages of ground breaking and construction. Thanks to Tom for a job well done and thanks to Dick for his willingness to take over. December 17, 2002
At the December 12, 2002
meeting of the Building Committee (St ABC) a representative of Sundt
Construction Company explained how they planned to handle the construction of
St. Andrew's new sanctuary/Sunday school facilities. Assuming that no problems
are encountered in obtaining building permits, ground-breaking is expected by
next Spring.
The St. Andrew's
Building Committee met with the Architect and General Contractor on January 25,
2003 to review the completed plans in preparation for a special meeting on
January 31 to focus on ways to reduce costs. The current subcontractor bids are
higher than anticipated and need to be reduced before we can sign the general
contract. An early spring ground breaking is still planned. St ABC members met with Gresham & Beach Architects on February 7 to establish the maximum allowable expenditure to complete the new sanctuary/church school facilities. Modifications must be made to keep costs within the available funds. Changes must be made in the plans to accommodate handicap access and other needs. Until these requirements are met we cannot set a ground-breaking date. A Subcommittee of the Building Committee has reviewed the architectural plans and is generating a list of cost saving items as well as a draft of needed changes in the plans to meet St Andrew's needs and improvements. A final draft will be considered by the full committee for approval. Three representatives of the St. Andrew’s Building Committee (St. ABC) recently met with our architects to discuss the status of our building construction process. This meeting provided the opportunity to have a very frank discussion regarding our concerns over increased cost projections. We are pleased with the pledge of support from the architects to actively work with us to review options for reducing construction costs. While they will continue to work with Sundt Construction to determine the reason for the projected cost escalation and their mitigation, they support the option to re-bid the entire project competitively, as necessary. A very important part of the current process is in the hands of the building committee. We are currently putting together a list of building plan changes that should not only reduce construction costs but also make some important improvements. The committee feels strongly that the Lord is moving us toward a successful completion of our project in days ahead. If all goes well we should break ground in the fall. Thank you for your continued prayers. Representatives of the St. Andrew’s Building Committee (St. ABC) recently met with our architects to discuss the status of our building construction process. This meeting provided the opportunity to have a very frank discussion regarding our concerns over increased cost projections. We are pleased with the pledge of support from the architects to actively work with us to review options for reducing construction costs. While they will continue to work with Sundt Construction to determine the reason for the projected cost escalation, they support the option to re-bid the entire project competitively, as necessary. A very important part of the current process is in the hands of the building committee. We are currently putting together a list of building plan changes that should not only reduce construction costs but also make some important improvements. The committee feels strongly that the Lord is moving us toward a successful completion of our project in days ahead. If all goes well we should break ground in the fall. Thank you for your continued prayers. March 20, 2003
The St ABC
subcommittees are still sorting out our options for cost reduction and for
making changes that we feel are necessary to meet handicap requirements and
other operating needs. The committee of the whole will meet when progress has
been made. New Allen Organ to Arrive Soon. After years of research, planning, and preparing, our new Allen Digital Organ, the Renaissance Model 460, will arrive and be installed in our current sanctuary in the next few days, just in time for Holy Week and Easter. Originally, it had been thought that this magnificent instrument would be installed first in our new Sanctuary, but our organ builders have allowed us to take delivery now at no additional cost to our church. Our current pipe organ has continued to decline in dependability and it is therefore a great blessing that we have been able to take delivery of this fine new instrument. In hopes of once again using the existing pipe organ (with some needed repairs) when our new building is complete, the old organ will remain exactly where it is while we install the new instrument’s console on the opposite side of the chancel. Our new organ’s speaker cabinets will be housed in our current pipe organ chamber without the removal of any existing pipes.
During the construction of our new sanctuary we will continue to hold worship services at the times listed above, however, construction requirements will make it necessary to move the Contemporary Worship Service from Gospel Hall to our existing main Sanctuary. This move will create increased congestion in our parking lots. These minor adjustments to our worship schedule will allow sufficient time for parking lots to empty so that spaces will be available to those arriving for the next service. These changes were made after careful study and prayer. Thank you for your understanding and assistance during this time of transition. April 15, 2003
A list of changes that we would like to see in the design
drawings and specifications is under review by Greshem & Beach and a
subcommittee of St ABC. We expect this stage of the project development will be
completed soon so that we can submit the project for construction bids. St. Andrew’s Building Committee continues to negotiate with the architect in an attempt to reduce the projected costs of the new facility to an amount that the church can afford. A document prepared by St. ABC, which includes many cost-cutting ideas, has been presented to the architect who has responded with his review of the document and his concerns. In the next few weeks the committee and architects will work together to resolve issues and move towards final negotiations with a contractor. If all goes well, groundbreaking will occur late in the fall. Members of the St. Andrew’s Building Committee recently met with Gresham and Beach Architects to discuss what must be done to complete the construction documents to assure that they meet the mission of our programs. We are all working together with a renewed spirit of cooperation in completing the project. Within the next few weeks, they will provide us with an itemized cost figure for incorporating changes we had specified in an earlier request. Our goal continues to be a late November/early December ground breaking. June 8, 2003 We will have new service times while the new building is under construction. Click here for the details. We continue to work with our architects and Sundt Construction to implement changes in the construction plans that will reduce costs and get us within our budget. Both the architects and the construction company have pledged their support to see that our facility is built. Our suggested cost-saving changes as well as input from Sundt, their subcontractors, and the architects are all being included in this process. This is not a quick and easy process but with the renewed spirit of cooperation of all parties, we see a positive outcome in the near future. We continue to point to an end-of-year groundbreaking. The St. Andrew's
Building Committee met with Gresham & Beach architects August 27 to review
possible design cost reduction proposals. In order to bring the project in line
with the church's financial capabilities it will be necessary to make some
design changes and to delay the completion of some features of the new
facilities. The Committee approved design changes and the architects will
complete the drawings & specifications. When this work is complete, permits
will be requested. It appears that ground breaking could occur about year-end
or shortly thereafter. Excepts from a letter from the session, "Why Build a New Building". On March 26, 2000, our congregation voted that “...the Session through its Board of Trustees shall enter into construction contracts to build new facilities provided that the total amount of debt shall not exceed $2.2 million.” It was a time of numerical prosperity within our congregation with crowded services and rooms that were filled with activities. Since that time several members left the church because of theological diversity and personnel issues. Others have joined the church because of a strong affirmation of the Historic Christian Reformed theology of the Presbyterian Church and a new awareness of the mission and ministry that God has set before us and our church. Our building committee has been actively engaged with the architects on cost estimates of our new facility. Although it has proven to be very challenging to reach an acceptable cost, the hard work is paying off and good progress is now being made. Although the time required for this value-design work has been much more than what we all expected, these cost-reduction deliberations were necessary. We have not yet reached our final cost objective; however, we are getting very close. Now that we have begun the 2004 Stewardship Campaign we want to take the opportunity to again review our financial condition before proceeding with the construction contract. A 10% increase in pledged giving for 2004 is necessary to maintain our ministries and missions at St. Andrew's as well as to pay expenses related to new construction. Our decision to begin construction in late 2003 or early 2004 will be possible if we are on track to achieve or exceed this increase in stewardship. Your prayers and financial support during this particular stewardship campaign are critical to advancing St. Andrew’s plans to both proceed with the new building construction and to maintain vibrant, Christ-centered, spiritual ministries. We will continue to keep the congregation informed as significant milestones and decisions are reached. New Building † Budget for new facility: $5.6 M, $600 K-$800 K for furnishings + $4.8 M-$5.0 M for construction costs. † As of January 2003, the projected cost for construction was $5.7 M. † The Building Committee (St. ABC) working closely with architects and contractor to identify cost reduction options that will not negatively impact the church’s ability to carry out its mission. † Architects and contractor initiating plan changes and preparing new cost estimates based on the identified cost reduction options. Will not be complete before October 31, 2003. † Groundbreaking could begin in January 2004, but if the new cost projections again turn out higher than the budget, other options will have to be considered.
Detailed work on
adjustments to the new building design have identified where cuts can be
made without limiting the ultimate ability to complete all aspects of the
project. In addition, requested design changes were made to accommodate our
needs for incorporating stained glass windows in the west wall, a handicap
ramp rather than lift for the chancel area, deep chancel steps to
accommodate children's story time, and simplification of the central cross
in the chancel area, and changes in the courtyard tree plantings. The St. Andrew’s Building Committee is working closely with our architects to complete cost reduction changes to the final plans. As parts of the plans are redrawn and completed, they are being submitted to the committee for review and approval by committee representatives and appropriate church staff. This process should be completed by early November. The final construction documents will then be submitted to our contractor who will complete a final Guaranteed Maximum Price which will be provided to Session for their approval at their December 16 meeting. We continue to point towards an early 2004 ground breaking. November 23, 2003 Click here for Cost cutting changes and improvements included in the final plans Click here for Key features of the new building
The Session unanimously approved the motion
agreed by all parties at our late afternoon meeting on
December 16th.
The basics of the motion was that they approved the amount of $5.3M for construction and that the church establish a separate $225,000 fund for testing, permits, assessments and contingencies.We have been a long time arriving at this point, but now it is all speed ahead. Expect to break ground early 2004 as soon as building permits are obtained from PIMA County
We are now embarking on a new era in the life of
St. Andrews. Now comes the fun stuff!
Dick Backus, Chairman of St. Andrew’s Building Committee (St. ABC); Rick Rollman, President of the Board of Trustees, and Bill Ricker, member of St. ABC, came to the Session in December with very good news concerning our new sanctuary and education building. You may have heard that over the last several weeks excellent progress was being made on reducing the cost of the new building to an amount that is within our budget. The good news is, late on December 16, 2003, Sundt Construction Inc., presented the cost of $5,300,000 that we could accept to construct the building. During the Session meeting, by unanimous vote, the Session accepted the proposal from Sundt and directed the president of our Board of Trustees to sign a construction contract with the company. Both Session and the building committee agreed that it was only through the miraculous work of the Lord that all of the obstacles were overcome to achieve this cost proposal. They also recognized the tremendous work of Tom Cochran, former Chairman of St. ABC, and thanked him for leading the design effort for the new building. Thanks to our building team, to those who have provided and will provide financial support, and foremost, praise the Lord! Although permits and pre-construction activities are the next step, it is possible we will see groundbreaking in late January 2004. “Blessed, highly favored, and positioned to prosper!” |
After many long years of prayer, planning, and perseverance, the groundbreaking for our new sanctuary and educational facilities will take place on Saturday, January 31, at 2p.m. We will begin with a time of worship in our existing main Sanctuary and proceed to the construction site.
The completed plans were submitted by our architects to Pima County for permits on December 19. The contract terms with Sundt Construction, Inc. were approved by Session on December 16
Actual construction cannot begin until the building permit is issued by Pima
County. In the meantime, site preparation work will begin in February by St.
Andrew’s volunteers with the demolition of the two modular units and the removal
of several palm trees. Contemporary Worship will continue to meet in Gospel Hall
until the permits are approved by Pima County, tentatively between mid-February
and mid-March. During construction,
Contemporary Worship and The Worship Thing will meet in the Sanctuary
2004 will be an exciting year for St. Andrew’s, but it will also be a year full of challenges, parking issues, space concerns, and construction turmoil. Praise God for this year of wonderful growth in Christ! This is a great opportunity for all of us to exercise the grace of Christ to one another.